First Deployment

A guided path from a fresh tenant to a verified first production deployment.

ACT

Activation FlowFirst DeploymentProduction Hardening

Your first deployment proves the full Govula loop end-to-end: a tenant is created, an operator signs in, a governed action is taken, and the resulting evidence is verifiable in the ledger. This page is the shortest path through that loop.

What you'll do, and what the system records

  1. Pick a topology in the Decision Tree.
  2. Install via the Deployment Hub.
  3. Create the first tenant — see Tenant Setup.
  4. Run the Activation Flow to seed the first operator and a verified action.
  5. Confirm via the Audit Logs that the action is hash-chained.

What to confirm before crossing into production

You are here · Get Started · step 3
Before you continue
Quick Startprerequisite

Complete the Quick Start before deploying a real tenant.

What should I do next?

What is Govulaprimary

continues in "get-started"; high glossary density (7 terms)

Ranked using IA v1 graph + intent map + glossary density (deterministic; no AI inference).